Major port at Le Havre

 

PORT 2000 Phase 2: supply and installation of 3.4 km of ballast track and 8 switches and crossings.


PORT 2000 interconnecting tracks: supply and installation of 8 km of concrete track and 19 switches and crossings, in joint-venture with EUROVIA’s Haute-Normandie du Havre division for the excavation and backfilling works.

Latest news
THE SANTIAGO, CHILE METRO CONTINUES ITS EXPANSION WITH ETF on 8/26/2018

THE SANTIAGO, CHILE METRO CONTINUES ITS EXPANSION WITH ETF

Read more >
Opening of the underground line 6 in Santiago , Chile on 11/7/2017

Opening of the underground line 6 in Santiago , Chile

Read more >
Innotrans 2016 on 9/20/2016

We're waiting for you stand 225, Hall 5.2 from 20 to 23 September

Read more >
see all news e >