Midi Pyrénées Rail Plan, lot C

 

NATURE OF THE PROJECT

Renewal of 210 km of track, including:
• Total renewal of the 10 switches and crossings
• Ballast renewal on 41 turnouts
• Waterproofing of 20 engineering structures
• 5,700 aluminothermic welds
• 86 level crossings
• 35 tunnels


PARTICULARITIES

Management of safety installations
Management of safety at level crossings
Single and winding track

Find your
BUSINESS CONTACT

Latest news
Innotrans 2016 on 9/20/2016

We're waiting for you stand 225, Hall 5.2 from 20 to 23 September

Read more >
ETF boosts in Canada with Rail Cantech on 2/3/2016

ETF boosts in Canada with Rail Cantech

Read more >
see all news e >
Last references
See all of our references >