Midi Pyrénées Rail Plan, lot C

 

NATURE OF THE PROJECT

Renewal of 210 km of track, including:
• Total renewal of the 10 switches and crossings
• Ballast renewal on 41 turnouts
• Waterproofing of 20 engineering structures
• 5,700 aluminothermic welds
• 86 level crossings
• 35 tunnels


PARTICULARITIES

Management of safety installations
Management of safety at level crossings
Single and winding track