{"id":10177771,"date":"2025-03-12T13:40:15","date_gmt":"2025-03-12T12:40:15","guid":{"rendered":"https:\/\/www.etf.fr\/uncategorized\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/"},"modified":"2025-04-11T17:12:36","modified_gmt":"2025-04-11T15:12:36","slug":"derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais","status":"publish","type":"post","link":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/","title":{"rendered":"Final bolts tightened on the Marseillais T3 tramway extension site !"},"content":{"rendered":"\n<p><strong>On 10 March 2025, a symbolic milestone was reached in the extension work on line 3 of the Marseille tramway. The ETF teams tightened the last bolts, finalising the connection of the rails on Rue de Rome and those on Place Castellane.<\/strong><\/p>\n\n\n\n<p>The event was attended by Martine VASSAL, President of the Aix-Marseille-Provence Metropolis and the Departmental Council of Bouches-du-Rh\u00f4ne, Catherine Pila, Vice-President of the Metropolis and President of the RTM, Solange BIAGGI, Metropolitan Councillor for City Centre Businesses and CIQ Am\u00e9nagement, and Beno\u00eet PAYAN, Mayor of Marseille.<\/p>\n\n\n\n<p>While the final finishing touches are being applied, this tramway extension promises to bring about a lasting transformation of mobility in Marseille. From the end of 2025, it will facilitate connections between the north and south of the city.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>Our teams carried out the studies for this project for the Aix-Marseille-Provence Metropolis from January 2022, and then started the construction phase in January 2023. This project aimed to extend the tram network by 15.7 km, spread over three strategic areas :<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>The Dromel-Montfuron SMR<\/strong>: 3.5 km of tracks dedicated to train maintenance and storage.<\/li>\n\n\n\n<li><strong>The North Extension<\/strong>: 3.6 km of tracks and three new stations to serve rapidly expanding neighbourhoods.<\/li>\n\n\n\n<li><strong>The South Extension<\/strong>: 8.8 km of tracks and nine new stations connecting southern neighbourhoods to the city centre.<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-group has-background\" style=\"background-color:#e5f1f9\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><strong><strong>Some key figures:<\/strong><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>2,000 welds made<\/li>\n\n\n\n<li>80,000 bolts tightened<\/li>\n\n\n\n<li>20,000 sleepers laid<\/li>\n\n\n\n<li>20,000 m\u00b3 of low-carbon concrete poured<\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<p><em><em>To read the full article on the work carried out, <\/em><a href=\"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/extension-of-marseilles-tramway-network-end-of-rail-works-on-line-t3\/#:~:text=Depuis%20janvier%202023%2C%20ETF%20m%C3%A8ne,en%20service%20pr%C3%A9vue%20en%202025\"><em>click here<\/em><\/a><\/em><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"401\" height=\"535\" data-id=\"9773276\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_155022-401x535.jpg\" alt=\"\" class=\"wp-image-9773276\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_155022-401x535.jpg 401w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_155022-188x250.jpg 188w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_155022-296x395.jpg 296w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_155022-1152x1536.jpg 1152w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_155022-1536x2048.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_155022-scaled.jpg 1920w\" sizes=\"auto, (max-width: 401px) 100vw, 401px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"401\" height=\"535\" data-id=\"9773274\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_150228-401x535.jpg\" alt=\"\" class=\"wp-image-9773274\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_150228-401x535.jpg 401w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_150228-188x250.jpg 188w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_150228-296x395.jpg 296w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_150228-1152x1536.jpg 1152w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_150228-1536x2048.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_150228-scaled.jpg 1920w\" sizes=\"auto, (max-width: 401px) 100vw, 401px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"401\" height=\"535\" data-id=\"9773270\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_145240-401x535.jpg\" alt=\"\" class=\"wp-image-9773270\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_145240-401x535.jpg 401w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_145240-188x250.jpg 188w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_145240-296x395.jpg 296w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_145240-1152x1536.jpg 1152w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_145240-1536x2048.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_145240-scaled.jpg 1920w\" sizes=\"auto, (max-width: 401px) 100vw, 401px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"401\" height=\"535\" data-id=\"9773272\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_145431-401x535.jpg\" alt=\"\" class=\"wp-image-9773272\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_145431-401x535.jpg 401w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_145431-188x250.jpg 188w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_145431-296x395.jpg 296w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_145431-1152x1536.jpg 1152w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_145431-1536x2048.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_145431-scaled.jpg 1920w\" sizes=\"auto, (max-width: 401px) 100vw, 401px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"713\" height=\"535\" data-id=\"9773278\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_155133-713x535.jpg\" alt=\"\" class=\"wp-image-9773278\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_155133-713x535.jpg 713w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_155133-250x188.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_155133-527x395.jpg 527w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_155133-1536x1152.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_155133-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 713px) 100vw, 713px\" \/><\/figure>\n<\/figure>\n<\/div>\n<\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On 10 March 2025, a symbolic milestone was reached in the extension work on line 3 of the Marseille tramway. The ETF teams tightened the last bolts, finalising the connection of the rails on Rue de Rome and those on Place Castellane.<\/p>\n","protected":false},"author":239,"featured_media":9773269,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[192,191],"tags":[],"class_list":["post-10177771","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-agences-grands-projets-transports-urbains-en","category-actualites-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Final bolts tightened on the Marseillais T3 tramway extension site ! - ETF<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Final bolts tightened on the Marseillais T3 tramway extension site ! - ETF\" \/>\n<meta property=\"og:description\" content=\"On 10 March 2025, a symbolic milestone was reached in the extension work on line 3 of the Marseille tramway. The ETF teams tightened the last bolts, finalising the connection of the rails on Rue de Rome and those on Place Castellane.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/\" \/>\n<meta property=\"og:site_name\" content=\"ETF\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-12T12:40:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-11T15:12:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_142119-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"chloe\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"chloe\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\\\/\"},\"author\":{\"name\":\"chloe\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#\\\/schema\\\/person\\\/b20334e710830573c2a3ba4ab9b7d679\"},\"headline\":\"Final bolts tightened on the Marseillais T3 tramway extension site !\",\"datePublished\":\"2025-03-12T12:40:15+00:00\",\"dateModified\":\"2025-04-11T15:12:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\\\/\"},\"wordCount\":244,\"publisher\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/20250310_142119-scaled.jpg\",\"articleSection\":[\"Agences Grands Projets Urbains\",\"Actualit\u00e9s\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\\\/\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\\\/\",\"name\":\"Final bolts tightened on the Marseillais T3 tramway extension site ! - ETF\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/20250310_142119-scaled.jpg\",\"datePublished\":\"2025-03-12T12:40:15+00:00\",\"dateModified\":\"2025-04-11T15:12:36+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/20250310_142119-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/20250310_142119-scaled.jpg\",\"width\":2560,\"height\":1920},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Final bolts tightened on the Marseillais T3 tramway extension site !\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#website\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/\",\"name\":\"ETF\",\"description\":\"Your transport partner worldwide\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.etf.fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#organization\",\"name\":\"ETF\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/logo-ETF.png\",\"contentUrl\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/logo-ETF.png\",\"width\":272,\"height\":161,\"caption\":\"ETF\"},\"image\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#\\\/schema\\\/person\\\/b20334e710830573c2a3ba4ab9b7d679\",\"name\":\"chloe\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/author\\\/chloe\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Final bolts tightened on the Marseillais T3 tramway extension site ! - ETF","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/","og_locale":"en_US","og_type":"article","og_title":"Final bolts tightened on the Marseillais T3 tramway extension site ! - ETF","og_description":"On 10 March 2025, a symbolic milestone was reached in the extension work on line 3 of the Marseille tramway. The ETF teams tightened the last bolts, finalising the connection of the rails on Rue de Rome and those on Place Castellane.","og_url":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/","og_site_name":"ETF","article_published_time":"2025-03-12T12:40:15+00:00","article_modified_time":"2025-04-11T15:12:36+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_142119-scaled.jpg","type":"image\/jpeg"}],"author":"chloe","twitter_card":"summary_large_image","twitter_misc":{"Written by":"chloe","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/#article","isPartOf":{"@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/"},"author":{"name":"chloe","@id":"https:\/\/www.etf.fr\/#\/schema\/person\/b20334e710830573c2a3ba4ab9b7d679"},"headline":"Final bolts tightened on the Marseillais T3 tramway extension site !","datePublished":"2025-03-12T12:40:15+00:00","dateModified":"2025-04-11T15:12:36+00:00","mainEntityOfPage":{"@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/"},"wordCount":244,"publisher":{"@id":"https:\/\/www.etf.fr\/#organization"},"image":{"@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/#primaryimage"},"thumbnailUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_142119-scaled.jpg","articleSection":["Agences Grands Projets Urbains","Actualit\u00e9s"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/","url":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/","name":"Final bolts tightened on the Marseillais T3 tramway extension site ! - ETF","isPartOf":{"@id":"https:\/\/www.etf.fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/#primaryimage"},"image":{"@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/#primaryimage"},"thumbnailUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_142119-scaled.jpg","datePublished":"2025-03-12T12:40:15+00:00","dateModified":"2025-04-11T15:12:36+00:00","breadcrumb":{"@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/#primaryimage","url":"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_142119-scaled.jpg","contentUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/03\/20250310_142119-scaled.jpg","width":2560,"height":1920},{"@type":"BreadcrumbList","@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/derniers-serrage-de-boulon-sur-lextension-du-tramway-3-marseillais\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.etf.fr\/en\/"},{"@type":"ListItem","position":2,"name":"Final bolts tightened on the Marseillais T3 tramway extension site !"}]},{"@type":"WebSite","@id":"https:\/\/www.etf.fr\/#website","url":"https:\/\/www.etf.fr\/","name":"ETF","description":"Your transport partner worldwide","publisher":{"@id":"https:\/\/www.etf.fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.etf.fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.etf.fr\/#organization","name":"ETF","url":"https:\/\/www.etf.fr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.etf.fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.etf.fr\/wp-content\/uploads\/2019\/03\/logo-ETF.png","contentUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2019\/03\/logo-ETF.png","width":272,"height":161,"caption":"ETF"},"image":{"@id":"https:\/\/www.etf.fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.etf.fr\/#\/schema\/person\/b20334e710830573c2a3ba4ab9b7d679","name":"chloe","url":"https:\/\/www.etf.fr\/en\/author\/chloe\/"}]}},"_links":{"self":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts\/10177771","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/users\/239"}],"replies":[{"embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/comments?post=10177771"}],"version-history":[{"count":3,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts\/10177771\/revisions"}],"predecessor-version":[{"id":10178066,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts\/10177771\/revisions\/10178066"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/media\/9773269"}],"wp:attachment":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/media?parent=10177771"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/categories?post=10177771"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/tags?post=10177771"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}