{"id":12480441,"date":"2024-04-18T10:06:16","date_gmt":"2024-04-18T08:06:16","guid":{"rendered":"https:\/\/www.etf.fr\/uncategorized\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/"},"modified":"2025-09-26T09:43:27","modified_gmt":"2025-09-26T07:43:27","slug":"des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine","status":"publish","type":"post","link":"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/","title":{"rendered":"Major technical advances on the Vitry-sur-Seine SMI construction site"},"content":{"rendered":"\n<p><em><strong><em><em><strong>The beginning of 2024 marked the completion of several milestones in the construction of the future Infrastructure Maintenance Site (SMI) in Vitry-sur-Seine (94). At the heart of Line 15&#8217;s operations, it is dedicated to maintenance workshops and equipment storage. It will also enable infrastructure maintenance to be carried out south of the line. Ultimately, it will accommodate nearly 450 employees.<\/strong><\/em><\/em><\/strong><\/em><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"951\" height=\"535\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-951x535.jpg\" alt=\"\" class=\"wp-image-1967609\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-951x535.jpg 951w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-250x141.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-702x395.jpg 702w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-1536x864.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 951px) 100vw, 951px\" \/><\/figure>\n\n\n\n<p>Since 26 September 2022, nearly 50 ETF employees have been working hard to complete the installation of the railway infrastructure (tracks and catenary) for the Vitry-sur-Seine SMI. Located 400 metres from the future Ardoines station, this project is a technical tour de force in terms of track laying.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile is-image-fill-element\"><div class=\"wp-block-media-text__content\">\n<p><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>A construction site with multiple technical challenges in a tunnel&#8230;<\/strong><\/h3>\n\n\n\n<p>The tunnel connecting the SMI to the main tunnel of Line 15 South is single-track with significant dimensions: 6.70 m in diameter, 1,728 m in length and a curve of +\/-600 m.<\/p>\n\n\n\n<p>This configuration requires the operational teams to work backwards when installing the rails. To do this, the rails are first laid out on either side of the walls, and the sleepers are installed as the work progresses. The tracks are assembled in 350-metre sections, using a template to ensure precision and alignment. This area is then concreted using a fixed pump and a pipe fed by the concrete mixer truck.<\/p>\n\n\n\n<p>Most of the rails installed are low-carbon, in line with a responsible environmental approach.<\/p>\n<\/div><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"803\" height=\"535\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7255-803x535.jpg\" alt=\"\" class=\"wp-image-1967617 size-full\" style=\"object-position:50% 50%\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7255-803x535.jpg 803w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7255-250x167.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7255-593x395.jpg 593w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7255-1536x1024.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7255-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 803px) 100vw, 803px\" \/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><\/div>\n<\/div>\n\n\n\n<div style=\"height:21px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile is-image-fill-element\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"357\" height=\"535\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7231-357x535.jpg\" alt=\"\" class=\"wp-image-1967615 size-full\" style=\"object-position:50% 50%\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7231-357x535.jpg 357w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7231-167x250.jpg 167w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7231-263x395.jpg 263w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7231-1024x1536.jpg 1024w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7231-1365x2048.jpg 1365w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7231-scaled.jpg 1707w\" sizes=\"auto, (max-width: 357px) 100vw, 357px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>&#8230; and above ground<\/strong><\/h3>\n\n\n\n<p>The technical challenges continue with the installation of a complex series of railway tracks. This is particularly the case for the interlocking installation of two double junction crossings (TJD) and a single junction (Brt), forming a diagonal line with a total length of 87 metres. In total, three TJD and twelve single Brt are planned to be installed, requiring careful planning and precise execution to ensure the tracks are properly connected.<\/p>\n\n\n\n<p>Various installation techniques have been used throughout the project to meet the structural requirements of the site. In particular, installation was carried out on a resin slab that envelops the rails, allowing the passage of pneumatic vehicles necessary for the supply and logistics of the SMI. For example, this will facilitate the delivery of landing doors that will equip the future stations of line 15 in the near future.<\/p>\n<\/div><\/div>\n\n\n\n<div style=\"height:21px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong><strong>Throughout this project, ETF teams competed in terms of techniques, methods and expertise to make all the ambitions of the client, Grand Paris Express, a reality. This project, like that of line 15 of the Grand Paris Express, is part of a social initiative with more than 7,000 hours of professional integration carried out on the SMI site in Vitry.<\/strong><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"803\" height=\"535\" data-id=\"1967619\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7278-803x535.jpg\" alt=\"\" class=\"wp-image-1967619\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7278-803x535.jpg 803w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7278-250x167.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7278-593x395.jpg 593w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7278-1536x1024.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_7278-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 803px) 100vw, 803px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"803\" height=\"535\" data-id=\"1967601\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/BR2I6859-803x535.jpg\" alt=\"\" class=\"wp-image-1967601\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/BR2I6859-803x535.jpg 803w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/BR2I6859-250x167.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/BR2I6859-593x395.jpg 593w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/BR2I6859-1536x1024.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/BR2I6859-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 803px) 100vw, 803px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"803\" height=\"535\" data-id=\"1967613\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_6856-803x535.jpg\" alt=\"\" class=\"wp-image-1967613\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_6856-803x535.jpg 803w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_6856-250x167.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_6856-593x395.jpg 593w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_6856-1536x1024.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/IMG_6856-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 803px) 100vw, 803px\" \/><\/figure>\n<\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"951\" height=\"535\" data-id=\"1967607\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0068-951x535.jpg\" alt=\"\" class=\"wp-image-1967607\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0068-951x535.jpg 951w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0068-250x141.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0068-702x395.jpg 702w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0068-1536x864.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0068-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 951px) 100vw, 951px\" \/><\/figure>\n<\/figure>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-3 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"951\" height=\"535\" data-id=\"1967605\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0061-951x535.jpg\" alt=\"\" class=\"wp-image-1967605\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0061-951x535.jpg 951w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0061-250x141.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0061-702x395.jpg 702w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0061-1536x864.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0061-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 951px) 100vw, 951px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"951\" height=\"535\" data-id=\"1967611\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0218-951x535.jpg\" alt=\"\" class=\"wp-image-1967611\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0218-951x535.jpg 951w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0218-250x141.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0218-702x395.jpg 702w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0218-1536x864.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0218-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 951px) 100vw, 951px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"803\" height=\"535\" data-id=\"1967603\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/BR2I6881-803x535.jpg\" alt=\"\" class=\"wp-image-1967603\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/BR2I6881-803x535.jpg 803w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/BR2I6881-250x167.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/BR2I6881-593x395.jpg 593w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/BR2I6881-1536x1024.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/BR2I6881-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 803px) 100vw, 803px\" \/><\/figure>\n<\/figure>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p><\/p>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The beginning of 2024 marked the completion of several milestones in the construction of the future Infrastructure Maintenance Site (SMI)&#8230;<\/p>\n","protected":false},"author":239,"featured_media":1967610,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[229,192],"tags":[],"class_list":["post-12480441","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-employment-and-education","category-agences-grands-projets-transports-urbains-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Major technical advances on the Vitry-sur-Seine SMI construction site - ETF<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Major technical advances on the Vitry-sur-Seine SMI construction site - ETF\" \/>\n<meta property=\"og:description\" content=\"The beginning of 2024 marked the completion of several milestones in the construction of the future Infrastructure Maintenance Site (SMI)...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/\" \/>\n<meta property=\"og:site_name\" content=\"ETF\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-18T08:06:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-26T07:43:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"chloe\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"chloe\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/\"},\"author\":{\"name\":\"chloe\",\"@id\":\"https:\/\/www.etf.fr\/#\/schema\/person\/b20334e710830573c2a3ba4ab9b7d679\"},\"headline\":\"Major technical advances on the Vitry-sur-Seine SMI construction site\",\"datePublished\":\"2024-04-18T08:06:16+00:00\",\"dateModified\":\"2025-09-26T07:43:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/\"},\"wordCount\":432,\"publisher\":{\"@id\":\"https:\/\/www.etf.fr\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-scaled.jpg\",\"articleSection\":[\"Employment and education\",\"Agences Grands Projets Urbains\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/\",\"url\":\"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/\",\"name\":\"Major technical advances on the Vitry-sur-Seine SMI construction site - ETF\",\"isPartOf\":{\"@id\":\"https:\/\/www.etf.fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-scaled.jpg\",\"datePublished\":\"2024-04-18T08:06:16+00:00\",\"dateModified\":\"2025-09-26T07:43:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/#primaryimage\",\"url\":\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-scaled.jpg\",\"contentUrl\":\"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-scaled.jpg\",\"width\":2560,\"height\":1440,\"caption\":\"DCIM102MEDIADJI_0087.JPG\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/www.etf.fr\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Major technical advances on the Vitry-sur-Seine SMI construction site\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.etf.fr\/#website\",\"url\":\"https:\/\/www.etf.fr\/\",\"name\":\"ETF\",\"description\":\"Your transport partner worldwide\",\"publisher\":{\"@id\":\"https:\/\/www.etf.fr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.etf.fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.etf.fr\/#organization\",\"name\":\"ETF\",\"url\":\"https:\/\/www.etf.fr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.etf.fr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.etf.fr\/wp-content\/uploads\/2019\/03\/logo-ETF.png\",\"contentUrl\":\"https:\/\/www.etf.fr\/wp-content\/uploads\/2019\/03\/logo-ETF.png\",\"width\":272,\"height\":161,\"caption\":\"ETF\"},\"image\":{\"@id\":\"https:\/\/www.etf.fr\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.etf.fr\/#\/schema\/person\/b20334e710830573c2a3ba4ab9b7d679\",\"name\":\"chloe\",\"url\":\"https:\/\/www.etf.fr\/en\/author\/chloe\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Major technical advances on the Vitry-sur-Seine SMI construction site - ETF","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/","og_locale":"en_US","og_type":"article","og_title":"Major technical advances on the Vitry-sur-Seine SMI construction site - ETF","og_description":"The beginning of 2024 marked the completion of several milestones in the construction of the future Infrastructure Maintenance Site (SMI)...","og_url":"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/","og_site_name":"ETF","article_published_time":"2024-04-18T08:06:16+00:00","article_modified_time":"2025-09-26T07:43:27+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-scaled.jpg","type":"image\/jpeg"}],"author":"chloe","twitter_card":"summary_large_image","twitter_misc":{"Written by":"chloe","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/#article","isPartOf":{"@id":"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/"},"author":{"name":"chloe","@id":"https:\/\/www.etf.fr\/#\/schema\/person\/b20334e710830573c2a3ba4ab9b7d679"},"headline":"Major technical advances on the Vitry-sur-Seine SMI construction site","datePublished":"2024-04-18T08:06:16+00:00","dateModified":"2025-09-26T07:43:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/"},"wordCount":432,"publisher":{"@id":"https:\/\/www.etf.fr\/#organization"},"image":{"@id":"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/#primaryimage"},"thumbnailUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-scaled.jpg","articleSection":["Employment and education","Agences Grands Projets Urbains"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/","url":"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/","name":"Major technical advances on the Vitry-sur-Seine SMI construction site - ETF","isPartOf":{"@id":"https:\/\/www.etf.fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/#primaryimage"},"image":{"@id":"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/#primaryimage"},"thumbnailUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-scaled.jpg","datePublished":"2024-04-18T08:06:16+00:00","dateModified":"2025-09-26T07:43:27+00:00","breadcrumb":{"@id":"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/#primaryimage","url":"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-scaled.jpg","contentUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2024\/04\/DJI_0087-scaled.jpg","width":2560,"height":1440,"caption":"DCIM102MEDIADJI_0087.JPG"},{"@type":"BreadcrumbList","@id":"https:\/\/www.etf.fr\/en\/employment-and-education\/des-avancees-techniques-majeurs-sur-le-chantier-du-smi-de-vitry-sur-seine\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.etf.fr\/en\/"},{"@type":"ListItem","position":2,"name":"Major technical advances on the Vitry-sur-Seine SMI construction site"}]},{"@type":"WebSite","@id":"https:\/\/www.etf.fr\/#website","url":"https:\/\/www.etf.fr\/","name":"ETF","description":"Your transport partner worldwide","publisher":{"@id":"https:\/\/www.etf.fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.etf.fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.etf.fr\/#organization","name":"ETF","url":"https:\/\/www.etf.fr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.etf.fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.etf.fr\/wp-content\/uploads\/2019\/03\/logo-ETF.png","contentUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2019\/03\/logo-ETF.png","width":272,"height":161,"caption":"ETF"},"image":{"@id":"https:\/\/www.etf.fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.etf.fr\/#\/schema\/person\/b20334e710830573c2a3ba4ab9b7d679","name":"chloe","url":"https:\/\/www.etf.fr\/en\/author\/chloe\/"}]}},"_links":{"self":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts\/12480441","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/users\/239"}],"replies":[{"embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/comments?post=12480441"}],"version-history":[{"count":1,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts\/12480441\/revisions"}],"predecessor-version":[{"id":12480443,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts\/12480441\/revisions\/12480443"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/media\/1967610"}],"wp:attachment":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/media?parent=12480441"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/categories?post=12480441"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/tags?post=12480441"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}