{"id":12523545,"date":"2020-04-14T11:56:18","date_gmt":"2020-04-14T09:56:18","guid":{"rendered":"https:\/\/www.etf.fr\/uncategorized\/reprise-progressive-des-travaux-en-zone-dense\/"},"modified":"2025-09-30T09:07:47","modified_gmt":"2025-09-30T07:07:47","slug":"reprise-progressive-des-travaux-en-zone-dense","status":"publish","type":"post","link":"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/","title":{"rendered":"Gradual resumption of work in densely populated areas"},"content":{"rendered":"\n<p><strong><em>As we mentioned in <\/em><\/strong><a href=\"https:\/\/www.etf.fr\/agence-idf\/etf-se-mobilise-pour-assurer-une-continuite-de-service\/\"><strong><em>a previous news item<\/em><\/strong><\/a><strong><em>,<\/em><em>maintenance of the railway network is essential for its operation and the smooth flow of goods and people. Even when traffic is significantly reduced, maintaining track geometry, reinforcing ballast pads, replacing half-fittings on points, incorporating points, etc. are examples of work that is essential to keeping the network in good condition. Failure to carry out this work <\/em><em>would result in the implementation of temporary speed restrictions, which are very disruptive at present and will continue to be so when traffic resumes in the coming weeks.<\/em><\/strong><\/p>\n\n\n\n<p><strong><em>\u2018The health and safety of all our employees is our top priority.\u2019<\/em><\/strong><em> This motto, which we already apply on all our sites, is even more relevant in this period of pandemic. Since the start of lockdown, all ETF teams have been working together to define and implement preventive measures. New working methods, complying with protective measures, have been devised and developed. These enable us to carry out emergency work while taking into account all the constraints associated with COVID-19.<\/em><\/p>\n\n\n\n<p><em>This resumption of activity has been the subject of extensive preparation, applying the recommendations of the OPPBTP (French Professional Organisation for Prevention in the Construction Industry), reinforced by around fifty specific instructions. The specific operating procedures and general ETF measures have been shared with the teams and staff representatives. Feedback is collected each week from all project stakeholders (teams, staff representatives, SNCF customer) to enable us to continuously improve all our operating procedures.<\/em><\/p>\n\n\n\n<p>The \u00cele-de-France rail network is a key public service provider. In this area, which has been particularly affected by Covid-19, it is essential to enable users, especially healthcare workers, to travel safely.<\/p>\n\n\n\n<p>After a four-week shutdown, the first work train ran on the RER C line during the night of 9 to 10 April. This train consisted of a locomotive at the front, seven ballast tamping machines, one tamping machine, one levelling\/stabilising machine and a locomotive at the rear.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" data-id=\"7926\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/Sans-titre.png\" alt=\"\" class=\"wp-image-7926\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/Sans-titre.png 300w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/Sans-titre-250x167.png 250w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"401\" height=\"535\" data-id=\"7915\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92434802_659505418214226_1693882157480542208_o-401x535.jpg\" alt=\"\" class=\"wp-image-7915\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92434802_659505418214226_1693882157480542208_o-401x535.jpg 401w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92434802_659505418214226_1693882157480542208_o-188x250.jpg 188w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92434802_659505418214226_1693882157480542208_o-296x395.jpg 296w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92434802_659505418214226_1693882157480542208_o-1152x1536.jpg 1152w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92434802_659505418214226_1693882157480542208_o.jpg 1512w\" sizes=\"auto, (max-width: 401px) 100vw, 401px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"401\" height=\"535\" data-id=\"7917\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92484514_659504628214305_7360145538005598208_o-401x535.jpg\" alt=\"\" class=\"wp-image-7917\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92484514_659504628214305_7360145538005598208_o-401x535.jpg 401w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92484514_659504628214305_7360145538005598208_o-188x250.jpg 188w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92484514_659504628214305_7360145538005598208_o-296x395.jpg 296w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92484514_659504628214305_7360145538005598208_o-1152x1536.jpg 1152w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92484514_659504628214305_7360145538005598208_o.jpg 1512w\" sizes=\"auto, (max-width: 401px) 100vw, 401px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"713\" height=\"535\" data-id=\"7919\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92697191_659504431547658_2340629985158496256_o-713x535.jpg\" alt=\"\" class=\"wp-image-7919\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92697191_659504431547658_2340629985158496256_o-713x535.jpg 713w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92697191_659504431547658_2340629985158496256_o-250x188.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92697191_659504431547658_2340629985158496256_o-527x395.jpg 527w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92697191_659504431547658_2340629985158496256_o-1536x1152.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/92697191_659504431547658_2340629985158496256_o.jpg 2016w\" sizes=\"auto, (max-width: 713px) 100vw, 713px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"713\" height=\"535\" data-id=\"7921\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/slide-713x535.jpg\" alt=\"\" class=\"wp-image-7921\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/slide-713x535.jpg 713w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/slide-250x188.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/slide-527x395.jpg 527w, https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/slide.jpg 1024w\" sizes=\"auto, (max-width: 713px) 100vw, 713px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>As we mentioned in a previous news item,maintenance of the railway network is essential for its operation and the smooth flow of goods and people. Even when traffic is significantly reduced, maintaining track geometry, reinforcing ballast pads, replacing half-fittings on points, incorporating points, etc. are examples of work that is essential to keeping the network in good condition. Failure to carry out this work would result in the implementation of temporary speed restrictions, which are very disruptive at present and will continue to be so when traffic resumes in the coming weeks.<\/p>\n","protected":false},"author":5,"featured_media":7927,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[223],"tags":[],"class_list":["post-12523545","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-grands-projets-ferroviaires-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Gradual resumption of work in densely populated areas - ETF<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gradual resumption of work in densely populated areas - ETF\" \/>\n<meta property=\"og:description\" content=\"As we mentioned in a previous news item,maintenance of the railway network is essential for its operation and the smooth flow of goods and people. Even when traffic is significantly reduced, maintaining track geometry, reinforcing ballast pads, replacing half-fittings on points, incorporating points, etc. are examples of work that is essential to keeping the network in good condition. Failure to carry out this work would result in the implementation of temporary speed restrictions, which are very disruptive at present and will continue to be so when traffic resumes in the coming weeks.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/\" \/>\n<meta property=\"og:site_name\" content=\"ETF\" \/>\n<meta property=\"article:published_time\" content=\"2020-04-14T09:56:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-30T07:07:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/Sans-titre.png\" \/>\n\t<meta property=\"og:image:width\" content=\"300\" \/>\n\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"mathilde\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"mathilde\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/grands-projets-ferroviaires-en\\\/reprise-progressive-des-travaux-en-zone-dense\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/grands-projets-ferroviaires-en\\\/reprise-progressive-des-travaux-en-zone-dense\\\/\"},\"author\":{\"name\":\"mathilde\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#\\\/schema\\\/person\\\/161a2c149c1f701b263f97f54de35dbd\"},\"headline\":\"Gradual resumption of work in densely populated areas\",\"datePublished\":\"2020-04-14T09:56:18+00:00\",\"dateModified\":\"2025-09-30T07:07:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/grands-projets-ferroviaires-en\\\/reprise-progressive-des-travaux-en-zone-dense\\\/\"},\"wordCount\":331,\"publisher\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/grands-projets-ferroviaires-en\\\/reprise-progressive-des-travaux-en-zone-dense\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/Sans-titre.png\",\"articleSection\":[\"Grands Projets Ferroviaires\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/grands-projets-ferroviaires-en\\\/reprise-progressive-des-travaux-en-zone-dense\\\/\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/grands-projets-ferroviaires-en\\\/reprise-progressive-des-travaux-en-zone-dense\\\/\",\"name\":\"Gradual resumption of work in densely populated areas - ETF\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/grands-projets-ferroviaires-en\\\/reprise-progressive-des-travaux-en-zone-dense\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/grands-projets-ferroviaires-en\\\/reprise-progressive-des-travaux-en-zone-dense\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/Sans-titre.png\",\"datePublished\":\"2020-04-14T09:56:18+00:00\",\"dateModified\":\"2025-09-30T07:07:47+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/grands-projets-ferroviaires-en\\\/reprise-progressive-des-travaux-en-zone-dense\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.etf.fr\\\/en\\\/grands-projets-ferroviaires-en\\\/reprise-progressive-des-travaux-en-zone-dense\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/grands-projets-ferroviaires-en\\\/reprise-progressive-des-travaux-en-zone-dense\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/Sans-titre.png\",\"contentUrl\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/Sans-titre.png\",\"width\":300,\"height\":200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/grands-projets-ferroviaires-en\\\/reprise-progressive-des-travaux-en-zone-dense\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gradual resumption of work in densely populated areas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#website\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/\",\"name\":\"ETF\",\"description\":\"Your transport partner worldwide\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.etf.fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#organization\",\"name\":\"ETF\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/logo-ETF.png\",\"contentUrl\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/logo-ETF.png\",\"width\":272,\"height\":161,\"caption\":\"ETF\"},\"image\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#\\\/schema\\\/person\\\/161a2c149c1f701b263f97f54de35dbd\",\"name\":\"mathilde\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/author\\\/mathilde\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Gradual resumption of work in densely populated areas - ETF","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/","og_locale":"en_US","og_type":"article","og_title":"Gradual resumption of work in densely populated areas - ETF","og_description":"As we mentioned in a previous news item,maintenance of the railway network is essential for its operation and the smooth flow of goods and people. Even when traffic is significantly reduced, maintaining track geometry, reinforcing ballast pads, replacing half-fittings on points, incorporating points, etc. are examples of work that is essential to keeping the network in good condition. Failure to carry out this work would result in the implementation of temporary speed restrictions, which are very disruptive at present and will continue to be so when traffic resumes in the coming weeks.","og_url":"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/","og_site_name":"ETF","article_published_time":"2020-04-14T09:56:18+00:00","article_modified_time":"2025-09-30T07:07:47+00:00","og_image":[{"width":300,"height":200,"url":"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/Sans-titre.png","type":"image\/png"}],"author":"mathilde","twitter_card":"summary_large_image","twitter_misc":{"Written by":"mathilde","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/#article","isPartOf":{"@id":"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/"},"author":{"name":"mathilde","@id":"https:\/\/www.etf.fr\/#\/schema\/person\/161a2c149c1f701b263f97f54de35dbd"},"headline":"Gradual resumption of work in densely populated areas","datePublished":"2020-04-14T09:56:18+00:00","dateModified":"2025-09-30T07:07:47+00:00","mainEntityOfPage":{"@id":"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/"},"wordCount":331,"publisher":{"@id":"https:\/\/www.etf.fr\/#organization"},"image":{"@id":"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/#primaryimage"},"thumbnailUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/Sans-titre.png","articleSection":["Grands Projets Ferroviaires"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/","url":"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/","name":"Gradual resumption of work in densely populated areas - ETF","isPartOf":{"@id":"https:\/\/www.etf.fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/#primaryimage"},"image":{"@id":"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/#primaryimage"},"thumbnailUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/Sans-titre.png","datePublished":"2020-04-14T09:56:18+00:00","dateModified":"2025-09-30T07:07:47+00:00","breadcrumb":{"@id":"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/#primaryimage","url":"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/Sans-titre.png","contentUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2020\/04\/Sans-titre.png","width":300,"height":200},{"@type":"BreadcrumbList","@id":"https:\/\/www.etf.fr\/en\/grands-projets-ferroviaires-en\/reprise-progressive-des-travaux-en-zone-dense\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.etf.fr\/en\/"},{"@type":"ListItem","position":2,"name":"Gradual resumption of work in densely populated areas"}]},{"@type":"WebSite","@id":"https:\/\/www.etf.fr\/#website","url":"https:\/\/www.etf.fr\/","name":"ETF","description":"Your transport partner worldwide","publisher":{"@id":"https:\/\/www.etf.fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.etf.fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.etf.fr\/#organization","name":"ETF","url":"https:\/\/www.etf.fr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.etf.fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.etf.fr\/wp-content\/uploads\/2019\/03\/logo-ETF.png","contentUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2019\/03\/logo-ETF.png","width":272,"height":161,"caption":"ETF"},"image":{"@id":"https:\/\/www.etf.fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.etf.fr\/#\/schema\/person\/161a2c149c1f701b263f97f54de35dbd","name":"mathilde","url":"https:\/\/www.etf.fr\/en\/author\/mathilde\/"}]}},"_links":{"self":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts\/12523545","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/comments?post=12523545"}],"version-history":[{"count":2,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts\/12523545\/revisions"}],"predecessor-version":[{"id":12523547,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts\/12523545\/revisions\/12523547"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/media\/7927"}],"wp:attachment":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/media?parent=12523545"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/categories?post=12523545"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/tags?post=12523545"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}