{"id":9509999,"date":"2025-02-11T21:23:07","date_gmt":"2025-02-11T20:23:07","guid":{"rendered":"https:\/\/www.etf.fr\/?p=9509999"},"modified":"2025-02-25T21:31:00","modified_gmt":"2025-02-25T20:31:00","slug":"tramway-t9-in-lyon-first-rail-weld","status":"publish","type":"post","link":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/","title":{"rendered":"Tramway T9 in Lyon: first rail weld"},"content":{"rendered":"\n<p><strong>10 February 2025 marked an important milestone in the construction of Lyon&#8217;s future T9 tramway line, with the first rail weld at Vaulx-en-Velin. To celebrate this milestone, the key players in the project gathered alongside Bruno Bernard, Chairman of the Lyon Metropolitan Authority and SYTRAL Mobilit\u00e9s, the Prefect, General Secretary of the Rh\u00f4ne Prefecture and Deputy Prefect for Equal Opportunities, Vanina Nicoli, the Mayor of Vaulx-en-Velin, H\u00e9l\u00e8ne Geoffroy, and the Deputy Mayor of Villeurbanne, Pauline Schlosser.<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">A line linking Vaulx-en-Velin-La Soie to Charpennes<br><\/h3>\n\n\n\n<p>The future T9 line will be 11.3 km long (including 8.8 km of new infrastructure) and will include 12 new stations linking Vaulx-en-Velin-La Soie to Charpennes. By linking the south and north of Vaulx-en-Velin, it will improve access to university centres such as the La Doua campus in Villeurbanne and the training centres in Vaulx-en-Velin. It will improve interconnections with other public transport lines, making journeys smoother and more accessible to all. By 2030, it will be carrying around 38,000 passengers a day, offering an efficient alternative to the car and making it easier to get around the Lyon metropolitan area.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">A major project<\/h3>\n\n\n\n<p><br>The T9 line will cover 8,800 metres of new track, incorporating a range of different laying techniques: conventional track, track on a floating slab, permeable track known as a \u2018green lane\u2019 and resin track on an engineering structure. The project calls for the installation of 10 turnouts and around 2,000 aluminothermic welds.<\/p>\n\n\n\n<p>After a preparation phase that began in July 2024, work began in January 2025. Four fronts of work will be carried out simultaneously, mobilising around fifty professionals. Connections to line T3 will be made from late February to early May 2025, while those to line T1 are scheduled for early April to early June 2025.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">An innovative and eco-responsible approach<\/h3>\n\n\n\n<p><br>The construction of line T9 is using an innovative technique: gravel asphalt, replacing the traditional concrete base. This method reduces the environmental impact by halving the thickness of the sub-base, thus limiting the need for materials and site machinery. The reduction in the number of lorries used also helps to reduce CO2 emissions. This technique uses recycled materials, reinforcing the sustainability of the project.<\/p>\n\n\n\n<p>\ud83d\udcf8 \u00a9 Jean-Philippe Malartre for SYTRAL Mobilit\u00e9s<\/p>\n\n\n\n<p>Works consortium: ETF, Eurovia, Jean Lefebvre Rh\u00f4ne-Alpes, De Filippis Entreprise, SOLS Confluence, Ma\u00efa Sonnier and Ma\u00efa Rail<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"804\" height=\"535\" data-id=\"9256021\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_001-804x535.jpg\" alt=\"\" class=\"wp-image-9256021\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_001-804x535.jpg 804w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_001-250x166.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_001-594x395.jpg 594w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_001-1536x1022.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_001-2048x1363.jpg 2048w\" sizes=\"auto, (max-width: 804px) 100vw, 804px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"803\" height=\"535\" data-id=\"9256023\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_051-803x535.jpg\" alt=\"\" class=\"wp-image-9256023\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_051-803x535.jpg 803w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_051-250x167.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_051-593x395.jpg 593w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_051-1536x1024.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_051-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 803px) 100vw, 803px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"803\" height=\"535\" data-id=\"9256025\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_054-803x535.jpg\" alt=\"\" class=\"wp-image-9256025\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_054-803x535.jpg 803w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_054-250x167.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_054-593x395.jpg 593w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_054-1536x1024.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_054-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 803px) 100vw, 803px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"356\" height=\"535\" data-id=\"9256035\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_080-356x535.jpg\" alt=\"\" class=\"wp-image-9256035\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_080-356x535.jpg 356w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_080-166x250.jpg 166w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_080-263x395.jpg 263w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_080-1022x1536.jpg 1022w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_080-1363x2048.jpg 1363w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_080-scaled.jpg 1703w\" sizes=\"auto, (max-width: 356px) 100vw, 356px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"356\" height=\"535\" data-id=\"9256033\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_074-356x535.jpg\" alt=\"\" class=\"wp-image-9256033\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_074-356x535.jpg 356w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_074-166x250.jpg 166w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_074-263x395.jpg 263w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_074-1022x1536.jpg 1022w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_074-1363x2048.jpg 1363w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_074-scaled.jpg 1703w\" sizes=\"auto, (max-width: 356px) 100vw, 356px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"803\" height=\"535\" data-id=\"9256037\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/T9-1ERE-SOUDURE_07-803x535.jpg\" alt=\"\" class=\"wp-image-9256037\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/T9-1ERE-SOUDURE_07-803x535.jpg 803w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/T9-1ERE-SOUDURE_07-250x167.jpg 250w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/T9-1ERE-SOUDURE_07-593x395.jpg 593w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/T9-1ERE-SOUDURE_07-1536x1024.jpg 1536w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/T9-1ERE-SOUDURE_07-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 803px) 100vw, 803px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"356\" height=\"535\" data-id=\"9256031\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_070-356x535.jpg\" alt=\"\" class=\"wp-image-9256031\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_070-356x535.jpg 356w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_070-166x250.jpg 166w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_070-263x395.jpg 263w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_070-1022x1536.jpg 1022w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_070-1363x2048.jpg 1363w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_070-scaled.jpg 1703w\" sizes=\"auto, (max-width: 356px) 100vw, 356px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"357\" height=\"535\" data-id=\"9256029\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_062-357x535.jpg\" alt=\"\" class=\"wp-image-9256029\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_062-357x535.jpg 357w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_062-167x250.jpg 167w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_062-263x395.jpg 263w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_062-1024x1536.jpg 1024w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_062-1365x2048.jpg 1365w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_062-scaled.jpg 1707w\" sizes=\"auto, (max-width: 357px) 100vw, 357px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"357\" height=\"535\" data-id=\"9256027\" src=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_059-357x535.jpg\" alt=\"\" class=\"wp-image-9256027\" srcset=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_059-357x535.jpg 357w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_059-167x250.jpg 167w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_059-263x395.jpg 263w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_059-1024x1536.jpg 1024w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_059-1365x2048.jpg 1365w, https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_059-scaled.jpg 1707w\" sizes=\"auto, (max-width: 357px) 100vw, 357px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>10 February 2025 marked an important milestone in the construction of Lyon&#8217;s future T9 tramway line, with the first rail&#8230;<\/p>\n","protected":false},"author":239,"featured_media":9256023,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[192,191],"tags":[],"class_list":["post-9509999","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-agences-grands-projets-transports-urbains-en","category-actualites-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tramway T9 in Lyon: first rail weld - ETF<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tramway T9 in Lyon: first rail weld - ETF\" \/>\n<meta property=\"og:description\" content=\"10 February 2025 marked an important milestone in the construction of Lyon&#8217;s future T9 tramway line, with the first rail...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/\" \/>\n<meta property=\"og:site_name\" content=\"ETF\" \/>\n<meta property=\"article:published_time\" content=\"2025-02-11T20:23:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-25T20:31:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_051-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"chloe\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"chloe\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/tramway-t9-in-lyon-first-rail-weld\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/tramway-t9-in-lyon-first-rail-weld\\\/\"},\"author\":{\"name\":\"chloe\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#\\\/schema\\\/person\\\/b20334e710830573c2a3ba4ab9b7d679\"},\"headline\":\"Tramway T9 in Lyon: first rail weld\",\"datePublished\":\"2025-02-11T20:23:07+00:00\",\"dateModified\":\"2025-02-25T20:31:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/tramway-t9-in-lyon-first-rail-weld\\\/\"},\"wordCount\":386,\"publisher\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/tramway-t9-in-lyon-first-rail-weld\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/1ERE-SOUDURE-T9_051-scaled.jpg\",\"articleSection\":[\"Agences Grands Projets Urbains\",\"Actualit\u00e9s\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/tramway-t9-in-lyon-first-rail-weld\\\/\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/tramway-t9-in-lyon-first-rail-weld\\\/\",\"name\":\"Tramway T9 in Lyon: first rail weld - ETF\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/tramway-t9-in-lyon-first-rail-weld\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/tramway-t9-in-lyon-first-rail-weld\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/1ERE-SOUDURE-T9_051-scaled.jpg\",\"datePublished\":\"2025-02-11T20:23:07+00:00\",\"dateModified\":\"2025-02-25T20:31:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/tramway-t9-in-lyon-first-rail-weld\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/tramway-t9-in-lyon-first-rail-weld\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/tramway-t9-in-lyon-first-rail-weld\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/1ERE-SOUDURE-T9_051-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/1ERE-SOUDURE-T9_051-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Premi\u00e8re soudure de rail T9\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/agences-grands-projets-transports-urbains-en\\\/tramway-t9-in-lyon-first-rail-weld\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tramway T9 in Lyon: first rail weld\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#website\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/\",\"name\":\"ETF\",\"description\":\"Your transport partner worldwide\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.etf.fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#organization\",\"name\":\"ETF\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/logo-ETF.png\",\"contentUrl\":\"https:\\\/\\\/www.etf.fr\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/logo-ETF.png\",\"width\":272,\"height\":161,\"caption\":\"ETF\"},\"image\":{\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.etf.fr\\\/#\\\/schema\\\/person\\\/b20334e710830573c2a3ba4ab9b7d679\",\"name\":\"chloe\",\"url\":\"https:\\\/\\\/www.etf.fr\\\/en\\\/author\\\/chloe\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tramway T9 in Lyon: first rail weld - ETF","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/","og_locale":"en_US","og_type":"article","og_title":"Tramway T9 in Lyon: first rail weld - ETF","og_description":"10 February 2025 marked an important milestone in the construction of Lyon&#8217;s future T9 tramway line, with the first rail...","og_url":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/","og_site_name":"ETF","article_published_time":"2025-02-11T20:23:07+00:00","article_modified_time":"2025-02-25T20:31:00+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_051-scaled.jpg","type":"image\/jpeg"}],"author":"chloe","twitter_card":"summary_large_image","twitter_misc":{"Written by":"chloe","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/#article","isPartOf":{"@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/"},"author":{"name":"chloe","@id":"https:\/\/www.etf.fr\/#\/schema\/person\/b20334e710830573c2a3ba4ab9b7d679"},"headline":"Tramway T9 in Lyon: first rail weld","datePublished":"2025-02-11T20:23:07+00:00","dateModified":"2025-02-25T20:31:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/"},"wordCount":386,"publisher":{"@id":"https:\/\/www.etf.fr\/#organization"},"image":{"@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/#primaryimage"},"thumbnailUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_051-scaled.jpg","articleSection":["Agences Grands Projets Urbains","Actualit\u00e9s"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/","url":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/","name":"Tramway T9 in Lyon: first rail weld - ETF","isPartOf":{"@id":"https:\/\/www.etf.fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/#primaryimage"},"image":{"@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/#primaryimage"},"thumbnailUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_051-scaled.jpg","datePublished":"2025-02-11T20:23:07+00:00","dateModified":"2025-02-25T20:31:00+00:00","breadcrumb":{"@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/#primaryimage","url":"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_051-scaled.jpg","contentUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2025\/02\/1ERE-SOUDURE-T9_051-scaled.jpg","width":2560,"height":1707,"caption":"Premi\u00e8re soudure de rail T9"},{"@type":"BreadcrumbList","@id":"https:\/\/www.etf.fr\/en\/agences-grands-projets-transports-urbains-en\/tramway-t9-in-lyon-first-rail-weld\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.etf.fr\/en\/"},{"@type":"ListItem","position":2,"name":"Tramway T9 in Lyon: first rail weld"}]},{"@type":"WebSite","@id":"https:\/\/www.etf.fr\/#website","url":"https:\/\/www.etf.fr\/","name":"ETF","description":"Your transport partner worldwide","publisher":{"@id":"https:\/\/www.etf.fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.etf.fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.etf.fr\/#organization","name":"ETF","url":"https:\/\/www.etf.fr\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.etf.fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.etf.fr\/wp-content\/uploads\/2019\/03\/logo-ETF.png","contentUrl":"https:\/\/www.etf.fr\/wp-content\/uploads\/2019\/03\/logo-ETF.png","width":272,"height":161,"caption":"ETF"},"image":{"@id":"https:\/\/www.etf.fr\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.etf.fr\/#\/schema\/person\/b20334e710830573c2a3ba4ab9b7d679","name":"chloe","url":"https:\/\/www.etf.fr\/en\/author\/chloe\/"}]}},"_links":{"self":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts\/9509999","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/users\/239"}],"replies":[{"embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/comments?post=9509999"}],"version-history":[{"count":1,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts\/9509999\/revisions"}],"predecessor-version":[{"id":9510106,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/posts\/9509999\/revisions\/9510106"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/media\/9256023"}],"wp:attachment":[{"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/media?parent=9509999"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/categories?post=9509999"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.etf.fr\/en\/wp-json\/wp\/v2\/tags?post=9509999"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}