Experience 24H of immersion on a track renewal and ballast site in Metz!

Publié le 12 November 2024

The ETF teams have mobilized to modernise 7 km of track on the Metz freight bypass (57), thus strengthening the reliability of the network and contributing to a more sustainable transport of goods.

Dive into the heart of this construction site alongside our experts in track, catenary and rail safety (FEROWAY), and discover in video all the stages of this operation: from the preparation of work trains at the rear base to the execution of the works.